EPM 10.0% 0.9¢ eclipse metals limited.

the timeframes speed up probably just needs EPM to ensure the...

  1. 3,375 Posts.
    lightbulb Created with Sketch. 848
    the timeframes speed up probably just needs EPM to ensure the 2024 drilling programme takes place.

    Oz Yellow deal needs to be completed.

    EPM needs to ensure it communicates to potential share holders that is in the process of obtaining a Sovereignty Seal, what better way than milestone check mid June 2024. Apparently the applicants receive some sort of milestone update or confirmation at mid year review point.

    Note the MiningNews Perth conference is at the Pan Pacific
    17 June 2024 - 18 June 2024.





    Last edited by Zhc003: 21/03/24
 
watchlist Created with Sketch. Add EPM (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $20.25M
Open High Low Value Volume
0.9¢ 0.9¢ 0.8¢ $28.97K 3.321M

Buyers (Bids)

No. Vol. Price($)
2 87500 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 199999 1
View Market Depth
Last trade - 16.10pm 24/05/2024 (20 minute delay) ?
Last
0.8¢
  Change
-0.001 ( 11.1 %)
Open High Low Volume
0.9¢ 0.9¢ 0.8¢ 309052
Last updated 11.54am 24/05/2024 ?
EPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.