GreenLeftAlbos-AEMO tells WA Premier Cook not to shut down Muja coal fired generation

  1. 8,941 Posts.
    lightbulb Created with Sketch. 27
    Muja coal-fired power station to stay open longer as WA energy shortfall revealed in AEMO report 17Aug23
    https://www.abc.net.au/news/2023-08-17/wa-electricity-gas-energy-shortage-muja-coal-extension/102740940
    Feel sorry for the new WA Premier Cook turning another backflip so soon after his heritage laws disaster.
    Cook will need a course in gymnastics if this keeps up.

    And the next WA election in March draws ever closer.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.