The temperatures at Ortahaza were high enough, 146 degrees C. It was the flow rate that did not meet the requirement.
These were the first two wells tested out of about 100 and with side tracking Ortahaza may provide the required flow rates for electricity generation.
The experience from Hungary won't help GRK at Olympic Dam but the guy from the Soultz project will. The Soultz project is HDR Geothermal.
The temperatures at Ortahaza were high enough, 146 degrees C. It...
Add to My Watchlist
What is My Watchlist?