Capital and build time on a "green" grid, I have had no non-subsidised numbers floated at me.
Nonetheless, cost of a very large amount of physical infrastructure surely has to be higher than the physically smaller amount of infrastructure needed for nuclear power.
>muh paperwork
How long did it take them to legally lock everyone down for weeks at a time multiple times a year.
Government can do whatever it wants. For some reason it likes us being at home, but doesn't like us having reliable energy.
- Forums
- Political Debate
- Grow up, go nuclear
Grow up, go nuclear, page-22
Featured News
Featured News
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online