Capital and build time on a "green" grid, I have had no...

  1. 2,709 Posts.
    lightbulb Created with Sketch. 289

    Capital and build time on a "green" grid, I have had no non-subsidised numbers floated at me.
    Nonetheless, cost of a very large amount of physical infrastructure surely has to be higher than the physically smaller amount of infrastructure needed for nuclear power.

    >muh paperwork
    How long did it take them to legally lock everyone down for weeks at a time multiple times a year.
    Government can do whatever it wants. For some reason it likes us being at home, but doesn't like us having reliable energy.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.