1) The pipeline will only hold up to 3 mil tonnes per annum.
2) They have a licence to produce up to 3 mil tones per annum.
Currently production is at 2.5 mil tonnes but I think there needs to be some technical work to allow the pipeline to reach capacity.
Current efforts to use UG mining and increase the open pit mining will probably achieve this AND extend the mine life as far as 2050 (2035 now).
One draw back from your suggestion would be a reduction in mine life so maybe your idea has some pros and conn.
- Forums
- ASX - By Stock
- GRR
- GRR Valuation
GRR Valuation, page-430
-
- There are more pages in this discussion • 70 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
25.0¢ |
Change
0.005(2.04%) |
Mkt cap ! $289.3M |
Open | High | Low | Value | Volume |
25.0¢ | 25.0¢ | 24.5¢ | $340.7K | 1.376M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 225779 | 24.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.0¢ | 84794 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 218085 | 0.245 |
10 | 92855 | 0.240 |
3 | 26322 | 0.235 |
5 | 160134 | 0.230 |
3 | 50544 | 0.225 |
Price($) | Vol. | No. |
---|---|---|
0.250 | 44794 | 2 |
0.255 | 87741 | 4 |
0.260 | 102136 | 3 |
0.265 | 13256 | 2 |
0.270 | 21256 | 2 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
GRR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online