GT1 1.39% 7.1¢ green technology metals limited

GT1 - Megathread, page-425

  1. 2,785 Posts.
    lightbulb Created with Sketch. 6112
    The probable contractor to build a concentration plant at Seymour (Primero) has just been awarded the FEED (Front-End Engineering Design) contract for A11's Ghana project (disc hold some A11).

    Core and A11 are both DMS Concentrator projects without floatation (at startup) being implemented by Primero. GT1 is also following this same pathway for Seymour so both these earlier projects will add to the already strong knowledge base Primero has for delivering projects and will hopefully assist Primero to deliver either on-time and budget or close to both when GT1 gets to the point of issuing a FEED contract, and presumably after that the main construction contract.
 
watchlist Created with Sketch. Add GT1 (ASX) to my watchlist
(20min delay)
Last
7.1¢
Change
-0.001(1.39%)
Mkt cap ! $22.84M
Open High Low Value Volume
7.1¢ 7.1¢ 7.1¢ $4.78K 67.32K

Buyers (Bids)

No. Vol. Price($)
3 107102 7.0¢
 

Sellers (Offers)

Price($) Vol. No.
7.1¢ 1215 1
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
GT1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.