Yep quite a change since 25 December (another clear picture, along with 29 Jan). From the distances I think its further step-out drilling not in-fill drilling as the new sites are 50-100m apart.
The red dots added would appear to be RL-22-349, RL-22-348, RL-22-347 then below that RL-22-368, RL-22-352 and RL-22-369.
And the dot below is RL-22-370. It would look as if they are now drilling 300m to the right of RL-22-370 so we would appear to have two strike extensions to the east.
There also appears to be step-out drilling to the west because the drilling plan (on the map of 10 Jan) didn't have five holes to the left of the main north/south area.
- Forums
- ASX - By Stock
- GT1 - Megathread
Yep quite a change since 25 December (another clear picture,...
-
-
- There are more pages in this discussion • 991 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GT1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.1¢ |
Change
-0.001(1.09%) |
Mkt cap ! $32.10M |
Open | High | Low | Value | Volume |
9.1¢ | 9.1¢ | 9.1¢ | $1 | 9 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 296189 | 8.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.0¢ | 40000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 296189 | 0.088 |
1 | 28563 | 0.087 |
1 | 180000 | 0.086 |
4 | 53750 | 0.085 |
2 | 23800 | 0.084 |
Price($) | Vol. | No. |
---|---|---|
0.090 | 40000 | 1 |
0.091 | 29407 | 2 |
0.092 | 24850 | 1 |
0.095 | 6200 | 1 |
0.099 | 197621 | 1 |
Last trade - 10.04am 18/09/2024 (20 minute delay) ? |
Featured News
GT1 (ASX) Chart |