re: beach equity well timing Looks like we get the Hunt rig 2 after BOW drills the big target at Banff-1 25th September. Should take #12 days then on to Byrock-2 ATP 269-P north of the Bodalla South oil field. Could it surprise on the upside with oil shows already documented at Byrock-1?