Should b a 6" dia hole to TD & then set a 5" liner.
More imp. with the mudloss & incr. mud weight due to incr in gas levels, I'd rather see them finish logging quickly & then cement the 7" liner, b4 drilling ahead.
Hope they got a few roughnecks hanging around & monitoring the pits.
Future plan looks fine, drill ahead with heavy mud to keep the gas in check. Hope they can wind up drilling by mid nxt week & plan a test after logging the 6" interval.
What was the proposed TD here 3050m(??) Doc?