Every thing is set for an excellent flow, which will in time lead to a commercial field. If you still have doubts have a look at the following:
"Alur Rambong-1, located approximately 17km to the west, tested 21 mmcfd of gas with 600 BPD of associated liquids from the Baong Sandstone in a similar trap setting."
Add to My Watchlist
What is My Watchlist?