Mining is just moving tonnes. 800k tonnes of ore, 4m tonnes of waste, should be something like that. The waste will be dumped to the wastedump near the deposit (Troy needs to make sure there is no ore below that). The remainder is carried to the plant. The plant can handle ca. 80k tonnes per month. Last quarter Troy overall material movement was 1.1m tonnes. The 80k oz number is just something that one uses normally as normally finding a new deposit will not have a much different grade what you alraedy have. And I think many may miss this one as 500k is just an ordinary find many other miners have. The grade makes all the difference. If this really turns out as inferred/hoped/wished for, it really is the Eldorado. Certainly worth much more than many marginal multi-million oz deposits.Cannot await mid-December, I think I am getting carried away.