From the Ann Positive Phase 1 L-Max® Plant Pre-Feasibility Study (http://www.lepidico.com/wp-content/uploads/2017/02/LPD-170227-Positive-Phase-1-L-Max-Plant-Pre-Feasibility-Study.pdf),
Our Inputs
Our outputs (for 29,000 tpa concentrate input to produce 3,000 tpa BG LCE)
We now have S-MAX so produce the Amorphous Silicate presumably in similar quantities?!
Flesh out the cost numbers for consumables we get
Product Annual (tpa) Consumption (Kg/t) Price (S/t) Total consumption (tpa) Total cost ($pa) 1 Inputs 2 Mica concentrate (4% lepidolite) 29,000 350 29,000 10,150,000 3 Sulfuric Acid 1,054 60 30,566 1,833,960 4 Limestone 706 38 20,474 778,012 5 Hydrated Lime 706 120 20,474 2,456,880 6 Sodium Carbonate 143 239 4,147 991,133 7 Caustic Soda 614 207 17,806 3,685,842 8 Formic Acid 13 600 377 226,200
our primary costs are concentrate, caustic soda, hydrated lime, and sulfuric acid in that order. now of course, this is based on 2017 numbers. However, it highlights that finding a location is a multi-variate problem
- Forums
- ASX - By Stock
- LPD
- GXY Relationship
GXY Relationship, page-58
-
- There are more pages in this discussion • 111 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPD (ASX) to my watchlist
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $17.17M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $140.1K | 70.49M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
65 | 190298017 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 22553301 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
65 | 190298017 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 22553301 | 14 |
0.003 | 85786642 | 59 |
0.004 | 34045985 | 36 |
0.005 | 11146545 | 11 |
0.006 | 7266154 | 13 |
Last trade - 12.55pm 01/08/2024 (20 minute delay) ? |
Featured News
MTL
Mantle Minerals' Nick Poll talks to HotCopper on finding gold grades up to 3.57g/t at Mt Berghaus
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
LPD (ASX) Chart |