NDO 0.61% 82.0¢ nido education limited

hakuryu-11 jack-up rig has commenced the tow t

  1. 13,783 Posts.
    Hakuryu 11 rig on-tow to the Balqis-1 well location, Baronang PSC, Indonesia

    Nido Petroleum Limited (ASX: NDO) (“Nido” or the “Company”) has been advised by Operator
    Lundin Petroleum that the Hakuryu-11 jack-up rig has commenced the tow to the Balqis-1 location in
    the Baronang Production Sharing Contract (‘PSC’), Republic of Indonesia.

    The Balqis-1 well will be followed by the Boni-1 well which will be drilled as an exploratory side-track
    well from the same surface location as Balqis-1 (refer Location Map).

    Nido will provide a further update to the market on the commencement of drilling operations at the
    Balqis-1 well.
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
(20min delay)
Last
82.0¢
Change
-0.005(0.61%)
Mkt cap ! $187.0M
Open High Low Value Volume
82.5¢ 82.5¢ 82.0¢ $1.522K 1.846K

Buyers (Bids)

No. Vol. Price($)
1 24818 82.0¢
 

Sellers (Offers)

Price($) Vol. No.
83.5¢ 2 1
View Market Depth
Last trade - 16.10pm 18/09/2024 (20 minute delay) ?
NDO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.