TVN 0.00% 4.6¢ tivan limited

Half year update, page-13

  1. 4,560 Posts.
    lightbulb Created with Sketch. 3164
    https://hotcopper.com.au/data/attachments/5436/5436003-673323ed9a86ee95a0af360e476965fd.jpg

    https://hotcopper.com.au/data/attachments/5436/5436008-145b93e701153dd0e01e626f6299ad6c.jpg

    https://hotcopper.com.au/data/attachments/5436/5436017-b5363f8959a5048450f99c7c5a4958e8.jpg

    900MW solar farm at Kununurra.

    Water
    Pipeline from Argyle Dam wall to Kununurra

    Tranmission upgrade from Argyle Dam wall to Kununurra

    Hydrogen transmission pipeline from Kununurra to Wyndham

    So there will be green hydrogen available at Wyndham.
    There will be pipeline builders mobilised for the area for water & hydrogen transmission lines.
    There will be HV power lines & solar PV farm builders mobilised for the area.

    I can see a cost effective case starting to emerge for a water, gas & electricity transmission line to a little mine to the West of Durack.
    Maybe even a bit of localised solar PV out that way as well.






    https://hotcopper.com.au/data/attachments/5436/5436043-b7a976070353f799961bd74570075c46.jpg
 
watchlist Created with Sketch. Add TVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.