900MW solar farm at Kununurra.
Water Pipeline from Argyle Dam wall to Kununurra
Tranmission upgrade from Argyle Dam wall to Kununurra
Hydrogen transmission pipeline from Kununurra to Wyndham
So there will be green hydrogen available at Wyndham.
There will be pipeline builders mobilised for the area for water & hydrogen transmission lines.
There will be HV power lines & solar PV farm builders mobilised for the area.
I can see a cost effective case starting to emerge for a water, gas & electricity transmission line to a little mine to the West of Durack.
Maybe even a bit of localised solar PV out that way as well.
- Forums
- ASX - By Stock
- TVN
- Half year update
Half year update, page-13
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $81.11M |
Open | High | Low | Value | Volume |
4.6¢ | 4.6¢ | 4.5¢ | $49.49K | 1.077M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 1037242 | 4.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.8¢ | 60870 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 1037242 | 0.045 |
1 | 227295 | 0.044 |
1 | 13000 | 0.043 |
1 | 1000000 | 0.042 |
2 | 90000 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.048 | 60870 | 2 |
0.049 | 100000 | 1 |
0.050 | 6398474 | 6 |
0.053 | 147612 | 1 |
0.055 | 300000 | 1 |
Last trade - 15.44pm 04/10/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |