Importantly:
Drilling has confirmed the existence of a massive sulphide body at London Bridge. A possible down-faulted
extension further to the south has been partially tested by holes for which results are not yet available. These
should be available for release by mid-February.
So i would say the Burra drill results should be out this week sometime.
Cdchi1
Add to My Watchlist
What is My Watchlist?