BPT is the operator so it's up to them to report to market...and that they did...refer to the monthly drilling report for december (03/01/13), and i quote...
The stimulation equipment is currently at Halifax-1 in Queensland, with seven of a revised fourteen stage program pumped. Stimulation in this well is addressing all Permian targets; the Patchawarra Formation, Murteree Shale, Epsilon Formation, Roseneath Shale, Daralingie Formation and Toolachee Formation. The remaining seven stages are expected to be placed by mid-January, with production testing anticipated to commence by early February.
- Forums
- ASX - By Stock
- halifax-1 no update on progress released byicn
BPT is the operator so it's up to them to report to market...and...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.608M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ICN (ASX) Chart |
Day chart unavailable