Which by Cooper's timelines means maybe by Christmas and 300% over budget....
It's mostly dependent on rig availability. And that is a case of "how long's a piece of string?"
Terrible result for JKA - the uncertainty hanging over this well will keep the SP crippled and prevent raising equity at a decent price.
- Forums
- ASX - By Stock
- hammamet west-3 suspended
Which by Cooper's timelines means maybe by Christmas and 300%...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)