Can't see them sinking a decline. Most pegmatites at Pioneer are exposed on the surface or near surface. The drill angles would have been set at 60 degrees to intersect the target. I would suggest that the 5,000 tonnes will be mined by open pit. Shallow RAB drilling into the near surface lode would confirm if Caesium is present.