INR 3.85% 13.5¢ ioneer ltd

Is it just me or is the elephant in the room the possible effect...

  1. 115 Posts.
    lightbulb Created with Sketch. 14
    Is it just me or is the elephant in the room the possible effect on the BFS and a redrawn site plan?

    If the margins move the available resource will likely diminish will it not?
    https://youtu.be/33jRwCgCxTI?t=1650
    What happens to project excitement if they have to downgrade available resource by 20%.

    With multiple years to verify they can propagate the buckwheat then add additional stages for the rollout it's still looking like a long slow road.




    (No need to smash me for my ignorance). Does the entire site have to be open pit can they dig underneath the buckwheat and still have an economically viable mine? https://youtu.be/ZXA2ae46nWY?t=865

 
watchlist Created with Sketch. Add INR (ASX) to my watchlist
(20min delay)
Last
13.5¢
Change
0.005(3.85%)
Mkt cap ! $315.5M
Open High Low Value Volume
13.0¢ 13.5¢ 13.0¢ $80.93K 607.0K

Buyers (Bids)

No. Vol. Price($)
4 228128 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
13.5¢ 365108 4
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
INR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.