mickz,In the figures for the oyster creek field i am using
4 x 5mmcfd =20mmcfd(total from 4 wells)
I am using $6 per thousand cubic feet of gas.
1000 x 6 = 1mmcfd or $6000
Antares share i am using 12.5mmcfd of 20mmcfd(average of 62.5% for all wells in field)
12.5mmcfd x $6000 = $75000 per day
hope this clarifies.
Upside not included is possible gas/condensate pay from anomila B sandstone.
Existing condensate pay.
Sorry about the poor typing skills.
Halve these figures and you are still looking at $A15m+.
Thanks for the constructive critisism.good luck.
- Forums
- ASX - By Stock
- AZZ
- harrison 1
harrison 1, page-19
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)