mickz,In the figures for the oyster creek field i am using 4 x 5mmcfd =20mmcfd(total from 4 wells) I am using $6 per thousand cubic feet of gas. 1000 x 6 = 1mmcfd or $6000 Antares share i am using 12.5mmcfd of 20mmcfd(average of 62.5% for all wells in field) 12.5mmcfd x $6000 = $75000 per day hope this clarifies. Upside not included is possible gas/condensate pay from anomila B sandstone. Existing condensate pay. Sorry about the poor typing skills. Halve these figures and you are still looking at $A15m+. Thanks for the constructive critisism.good luck.
AZZ Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held