tx Peak.
From the report. To mine BEFORE 2012. It's speeding up!
Based on these positive and robust project economics, Kasbah has commenced a
Pre-Feasibility Study (PFS) with a Definitive Feasibility Study (DFS) expected to be
released in 2011 for a decision to mine before 2012.