G'Day all-Will through out some conservative numbers based on what we can see & therefore the plant
is running -two separate materials utilising two methods as seen above.
As previously ascertained to have 9.7 g p/t in tailings stockpile the average mill feed grade was running at 13.5 g p/t
that's average mill feed-prior to blasting & stope improvements -leading to much better improvement in minimising dilution.
If we just use an average grade recovered of 12g p/t x 20t per hr ( gravity plant ) x 11 hours running per day (12 hr shift 2x 6 hrs )
=2,640 grams- 84.88 OZ per day at 20 Day's per month =1,697 oz per month.
That's an allowance of approx. 10 day's RDO's for production guy's 7 allows plenty of time for maintenance to occur
Then you have the bonus of high grade through HM-3 -likely from Mestre Zone call this very high grade material 31 g p/t
or one OZ per tonne at only one tonne per hr through-put ultra conservative probably only 0.7 of a cubic mt per tonne per hr.
that's another 11 OZ per day x 20 days-220 oz
Total being 1,897 OZ per month-imo conservative & without allowing for HM-4 running tailings .
Just rough calculations -though they appear good & conservative understand people being sceptical given the history
though the gravity plant see running at or about full spec is great news.
imo-gltah
salt
- Forums
- ASX - By Stock
- OGX
- Have a Ganda at the Gravity plant running at full spec?
Have a Ganda at the Gravity plant running at full spec?, page-14
-
- There are more pages in this discussion • 161 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OGX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & Managing Director
Charles Armstrong
CEO & Managing Director
SPONSORED BY The Market Online