The page may be a bit old i.e. "QMN is planning further reconnaissance work and up to 2000m of RC drilling on the two EPMs for the second half of the 2011."
The drilling results referred to were released in an announcement on 8 Sep 2011.
At least this was completed in the suggested time frame.