Juggernauts , A good point made IMO . This is infill drilling so it is likely that high grade zones are tight , in fact that is why it has been drilled so close . I am willing to bet the JORC will be much improved . Any extensions to the high grade zone will be looked on favourably . The size of this project is maybe 10% the size of Doolgunna . 10% of SFR's MC is $80m ! A bit more upside here me thinks .
AVB Price at posting:
6.7¢ Sentiment: Buy Disclosure: Held