re: drilling announcement out
A 6 page drilling report out- certainly nothing exciting this time.
From the diagrams showing the drill holes and their interpretation of the structures, it appears the previous drill holes travelled mainly WITH the ore-body, hence the wide ore-grade intercepts.
They will now have to re-orientate their drilling from the opposite direction and use a shallower angle to achieve true intercepts.
As I posted before, it'll be a long time before they get a handle on this one.