LCY 0.00% 1.3¢ legacy iron ore limited

Haw in TH, page-22

  1. 348 Posts.
    lightbulb Created with Sketch. 133
    Exactly Ocka,

    A refresh from SRK Consulting report :

    Low Grinding Costs
    Comprehensive testing on diamond core samples by Ammtec has provided a Bond Work Index of11kWh/t. This is relatively soft for magnetite BIF mineralisation. In comparison, most WA magnetite BIF projects have a Bond Work Index of circa 18 – 20 kWh/t.

    Low Operating Costs
    The combination of being able to produce a quality concentrate at a relatively coarse grind and the soft nature of the mineralisation has a very significant positive economic impact for a mining project at Mt Bevan. A major OPEX cost in magnetite projects is power consumption. Preliminary energy calculations based on the grind and bond work index indicate power requirements of only 12 kWh/t – this is very low compared to that of about 30 kWh/t for typical WA magnetite projects


 
watchlist Created with Sketch. Add LCY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.