1. PFS was completed a few weeks ago. [CLICK HERE]
2. The CAPEX is for a 20MTpa operation.
3. The OPEX is there in black and white. FOB costs are small compared to CAP's peers because of the geological occurances (soft siltstone etc) in the BIF which requires much less power to crush and grind.
1. PFS was completed a few weeks ago. [CLICK HERE]2. The CAPEX...
Add to My Watchlist
What is My Watchlist?