From the latest update...expecting some results 1st/2n week of...

  1. 205 Posts.
    From the latest update...expecting some results 1st/2n week of November

    Table 2 - Burraga Drilling Details
    Drillhole RC Length DD Length Comments
    RCR001A 0 4.0 Drillhole abandoned in old mine workings
    RCR001B 0 22.1 Drillhole abandoned in old mine workings
    RCR001C 0 69.6 Results expected 3rd/4th week of November
    RCR002 0 135.4 Results expected 3rd/4th week of November
    RCR003 0 180.3 Results expected 3rd/4th week of November
    RCR004 150 21.3 Results expected 1st/2nd week of November
    RCR005 144 0 Results expected 1st/2nd week of November
    RCR006 97 104.0 Results expected 1st/2nd week of November
    RCR008 96 54.8 Results expected 3rd/4th week of November
    RCR009 150 0 Results expected 3rd/4th week of November
    RCR010 150 0 Drillhole abandoned, off target
    Total 787 591.5


    Table 3 - Northcote Drilling Details
    Drillhole RC Length DD Length Comments
    ELM029 82 28.4 Pre-collar assays expected 1st/2nd week November
    ELM030 80 19.5 Pre-collar assays received. 3m @ 0.87 Au g/t from
    5m & 2m @ 0.93 Au g/t from 24m
    ELM031 45 56.7 Pre-collar assays expected 1st/2nd week November
    ELM032 49 59.3 Pre-collar assays received. NSI
    ELM033 66 35.6 Pre-collar assays received. 4m @ 1.86 Au g/t from
    31m
    ELM034 111 0 4m @ 1.48 Au g/t from 63m
    ELM035 99 8.5 Pre-collar assays received. 4m @ 1.24 Au g/t from
    42m & 3m @ 0.91 Au g/t from 48m
    ELM036 28 77.5 Pre-collar assays received. 1m @ 2.59 Au g/t from
    17m
    ELM037 35 66.0 Pre-collar assays expected 1st/2nd week November
    ELM038 70 31.6 Pre-collar assays expected 1st/2nd week November
    ELM039 32 66.4 Pre-collar assays expected 1st/2nd week November
    ELM040 39 62.4 Pre-collar assays expected 1st/2nd week November
    ELM041 53 46.0 Pre-collar assays received. NSI
    ELM042 53 49.1 Pre-collar assays received. NSI
    ELM043 29 73.7 Pre-collar assays received. NSI
    Total 871 680.7
    NSI – No significant intersection
    Table 4 – Mt Carbine Drilling Details
    Drillhole RC Length DD Length Comments
    MTC01 0 401.5 46m of diamond core despatched for analysis 19
    October. Assays expected late November
    MTC02A 0 8.1 Drillhole abandoned in fill
    MTC02B 0 390.7 Drillhole twinned earlier hole
    MTCTD01 5 0 No 4 tailings dam. Assays expected late November
    MTCTD02 5 0 No 4 tailings dam. Assays expected late November
    MTCTD03 5 0 No 4 tailings dam. Assays expected late November
    MTCTD04 8 0 No 4 tailings dam. Assays expected late November
    MTCTD05 4 0 No 4 tailings dam. Assays expected late November
    MTCTD06 4 0 No 4 tailings dam. Assays expected late November
    MTCWD01 3 0 Reject ore stockpile. Assays expected late November
    Total 34 800.3


 