Horizontals up to 1km (average 875m)are yielding great flow without steam. Steam will be added when needed. Possibly after 3 mths. Then flow will return to initial high flows.
They are cheap to do US$900K compared with vertical US$500k.
McCool still flowing huge water. Trying to find efficient disposal system. Getting small oil flow from well now. Many other wells in area show this characteristic.