PLS 1.06% $2.80 pilbara minerals limited

The rain in Chile will be felt in 6 months time when the...

  1. mvc
    2,993 Posts.
    lightbulb Created with Sketch. 301
    The rain in Chile will be felt in 6 months time when the evaporation has not proceeded at the required rate.

    How long is the lead time from fresh brine to shipping concentrate?

    We could get cyclones, in the Pilbara that may cause at worst a few weeks interruption, as water runs off and roads need some repairing, but our lithium wont be diluted for months to come. Now assuming we have a reasonable stockpile of 6% spod at the port, a cyclone may not even show up in PLS shipping volumes.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$2.80
Change
-0.030(1.06%)
Mkt cap ! $8.429B
Open High Low Value Volume
$2.81 $2.89 $2.79 $52.63M 18.65M

Buyers (Bids)

No. Vol. Price($)
23 263602 $2.80
 

Sellers (Offers)

Price($) Vol. No.
$2.82 8000 1
View Market Depth
Last trade - 16.10pm 06/08/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.