Interesting side issue is that Santos has already run a large 3D over PEL 115, which VPE will use to drill a well.
Not sure if this is a good or bad thing, STO must have found something on the 2D to run the 3D but then walked away?
Interesting side issue is that Santos has already run a large 3D...
Add to My Watchlist
What is My Watchlist?