CFU 0.00% 0.4¢ ceramic fuel cells limited

heinsberger volksbank advertising, page-16

  1. 106 Posts.
    By the way, before anyone starts talking about 2kW, I based the 1.5kW calculations on this.

    "From 7am to 10pm the BlueGen would be operating at 1.5kW"

    http://www.smarthomefamily.com.au/the-summer-test

    You can do the same calculations at 2kW output and it makes the 'missing' power even greater.

    At 2kw output:

    175,200kWh total over 10 years without degradation
    140,663kWh total over 10 years with degradation


    Difference of 34,537kWh @ €0.25983 = €8973.74 of 'lost' power.
 
watchlist Created with Sketch. Add CFU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.