Anyone got an idea of a timeframe for the airborne survey ????
Per a previous ann:
In addition to the drilling program it is planned to conduct a surface Induced Polarisation geophysical survey over the magnetic anomaly, designed to map zones of disseminated sulphides and a helicopter-borne electro-magnetic (VTEM) survey designed to detect massive sulphide bodies to depths of up to 400m. Geophysical contractors have been booked to complete this work in the March Quarter. The geophysics results, combined with those from the current drilling program, will provide guidance for the design of further drilling programs at the project. Magma is earning a 100% interest in the Thunder
- Forums
- ASX - By Stock
- MMB
- helicopter vtem survey
helicopter vtem survey
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)