S32 1.86% $3.70 south32 limited

My apologies, Dan. The grant really is for the HPMSM production...

  1. 5,584 Posts.
    lightbulb Created with Sketch. 1392
    My apologies, Dan. The grant really is for the HPMSM production facility, not the mine:

    The grant from the DOE’s Battery Materials Processing and Battery Manufacturing program will support the potential development of a commercial-scale manganese production facility. On a cost-share basis and subject to final negotiation, the DOE will provide 30 per cent of the cost of the manganese production facility, up to the grant award of US$166M.

    S32 earlier said uninterested in building and owning the processor. Maybe the grant changes the equation enough for S32 to become a vertically integrated
    HPMSM producer.

    Battery chemistry is very new and far from settled. There are at least 100 coherent battery chemical formulations.

    The qualities desired for a cell phone battery are distinctly different to a Battery Energy Storage System - weight, durability, cost. HPMSM may or may not feature as a 'future-facing ingredient'. GK & team are very aware of this. The grant lowers the risk a lot.

    Ash
 
watchlist Created with Sketch. Add S32 (ASX) to my watchlist
(20min delay)
Last
$3.70
Change
-0.070(1.86%)
Mkt cap ! $16.75B
Open High Low Value Volume
$3.72 $3.78 $3.68 $59.56M 16.22M

Buyers (Bids)

No. Vol. Price($)
9 640198 $3.69
 

Sellers (Offers)

Price($) Vol. No.
$3.72 41786 3
View Market Depth
Last trade - 16.10pm 18/10/2024 (20 minute delay) ?
S32 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.