CRR 0.00% 0.7¢ critical resources limited

the sp lagging at 4-5 c range is not a poor outcome if DD comes...

  1. 10,361 Posts.
    lightbulb Created with Sketch. 1025
    the sp lagging at 4-5 c range is not a poor outcome if DD comes positive- the key is in the drilling. So I predict after the initial reaction to the DD being affirmed, then the real games will begin as drilling will be planned and the instos will start jostling for position and CR will be conducted prior to drilling.
    The drilling is the key. We know from the MK drilling by avz, trenching can have mixed results however even a bad result was 40-60 m of li mineralisation following extensive impact of weathering. So having Sullivan and the avz dd team is vital for 4ceas they bring the knowledge and efficiency. Remember samples have already been sent to ALS from kitolo and what we are seeing is extensive exploration planning and investigating.
    6 trading days left - Leste see where we head. The key here is volume - I would love to c what would happen to the 1 mil. Sell if there is an attempt to nibble.
 
watchlist Created with Sketch. Add CRR (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.000(0.00%)
Mkt cap ! $12.46M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
3 313333 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 3433973 13
View Market Depth
Last trade - 16.12pm 08/08/2024 (20 minute delay) ?
CRR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.