just looking at those maps I am guessing around 100M strike depth 250 M long with 50 metre intercepts on average that gives a around 3Million BCM or around 10MT of ore. If its 3.5% Cu thats around 35,000 tons of Cu in situ enough for a small mining operation I am guessing of 1MTPA of ore processed starting with opencast then moving underground. Be interesting to see how far out I am when the JORC comes out
MWE Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held