High-Grade Itabirite Mineralisation
Intersected at Gofolo Main Prospect
HIGHLIGHTS
• Resource drilling at Gofolo Main prospect, part of Mofe Creek
Project, confirms significant intersections of High-Grade,
coarse itabirite mineralisation from surface
• Gofolo Main strike continuity extended by an additional 125%
from 0.8Km to 1.8Km, whilst mineralisation width has increased
by an additional 50m in the central portion of prospect
• Significant drilling intersections reported including:
o 18m @ 48.8% Fe from 2m
o 46m @ 40.4% Fe from surface
o 50m @ 31% Fe from surface
• Gofolo Main prospect only represents a strike length of 1.8Km
from a prospective strike length of 65Kms for the Mofe Creek
Project
• Excellent geological continuity observed between previous and
newly drilled holes
• Resource drilling underway at high-priority Zaway prospect and
metallurgical diamond drilling to commence shortly
• Potential high-grade friable itabirite intersected at Gofolo NE
and significant widths observed at Zaway; assays pending
• Scoping Study to be completed by mid-2014
- Forums
- ASX - By Stock
- TAW
- high-grade itabirite mineralisation
high-grade itabirite mineralisation
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TAW (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online