LRS 0.00% 14.5¢ latin resources limited

Highly undervalued, page-1483

  1. 2,531 Posts.
    lightbulb Created with Sketch. 122
    I think 20 days of drilling was planned.
    Drilling started on the 8th Feb.
    So in theory, without breakdowns or breakages Drilling should be completed by 28th Feb.

    Weve had a preliminary update on visual spodumene and depth.
    We may get more preliminary updates.
    If drilling is actually completed on the 28th of feb then mayby We could expect announced results out by the 1st, 2nd or 3rd of March.
    It would be great if the results come out that soon. It would show a great turn around from drilled cores to laboratory percentages.
 
watchlist Created with Sketch. Add LRS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.