"Lynas has 10 months to find a suitable location for the PDF and submit plans of the PDF."
Goofy, mud is never clear unless you are refering to mud itself. Secondly, according to AELB Dr Noorhasnah Khairullah, Lynas has 10 months to build the PDF, not scouting for a suiting location. This includes deriving the PDF design and finding suitable materials use for building it.
Details info is in this video
http://www.mobtv.my/public_events-1276.html
- Forums
- ASX - By Stock
- LYC
- history of confusion: lynas waste, residue.
history of confusion: lynas waste, residue., page-16
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.11 |
Change
-0.180(2.86%) |
Mkt cap ! $5.711B |
Open | High | Low | Value | Volume |
$6.12 | $6.15 | $6.07 | $17.65M | 2.889M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 26354 | $6.10 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.15 | 3758 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10596 | 6.100 |
2 | 329 | 6.090 |
3 | 1300 | 6.080 |
6 | 28264 | 6.070 |
2 | 166 | 6.060 |
Price($) | Vol. | No. |
---|---|---|
6.210 | 710 | 1 |
6.230 | 5000 | 1 |
6.280 | 4100 | 1 |
6.290 | 158 | 1 |
6.300 | 5200 | 1 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
LYC (ASX) Chart |