Alporfavor
Thanks for the excellent summary
Wrt the sentence from the 30-07-2010 quarterly that you highlighted at the end of your post....
"As anticipated, to maximise production rates it is expected that a submersible pump will need to be installed. Engineering design and contracting for this work has been completed during July with installation planned in August after which the Company will be in a position to confirm an actual flow rate from this well."
This presents an interesting timing issue wrt the known funding needed for J51 and the plan to spud that well in Sept.
Doesn't leave much time for NWZ2 production to prove itself(or otherwise)to potential placementees or farminees.
- Forums
- ASX - By Stock
- history on nwz 2
AlporfavorThanks for the excellent summaryWrt the sentence from...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
-0.009(36.0%) |
Mkt cap ! $20.39M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.6¢ | $11 | 667 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2389 | 1.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 2223 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2389 | 0.016 |
1 | 50000 | 0.011 |
1 | 10000 | 0.010 |
1 | 369069 | 0.002 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 2223 | 1 |
0.029 | 161037 | 1 |
0.032 | 100000 | 1 |
0.045 | 22000 | 1 |
0.050 | 170000 | 1 |
Last trade - 15.59pm 13/09/2024 (20 minute delay) ? |
Featured News
JPR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online