KDR 0.00% $1.90 kidman resources limited

Just doing some research, can someone one check if the below is...

  1. 59 Posts.
    Just doing some research, can someone one check if the below is correct about KDR..

    Northern Territory
    AUGUST 2010
    Mineral Investment Opportunities

    Project: Home of Bullion Mine

    COMMODITY : Copper (with Gold Silver Lead Zinc)
    PROJECT DETAILS
    Project Name: Home Of Bullion Mine
    Location: Barrow Creek NT Australia, approx 280 kms north of Alice Springs and 1220 kms
    south of Darwin.
    Project Tenements: 100% of EL 23186
    Tenement EL 23186

    Area Approx 400 sq. km Circa 2002

    Grant

    Expiry Rent paid to February 2010

    HISTORY OF PROJECT AREA

    Historic production of 2500 t @ 22.5% Cu.

    Comprehensive 3D modelling of the geology, mineralisation and sample/assay database of
    Home of Bullion Deposits. Past drilling by Goldstake has resulted in substantial estimated
    resource being defined.
    There are four mineral lodes in two groups. The Main Lode has been assessed as containing an
    initial estimated resource [ non JORC ] 308,000 tons at 13% Cu for 40,000 tons of Copper
    metal. This requires further drilling to bring to JORC status. Recent reassessment indicates up
    to 58,000 t of contained copper metal.

    Three further lodes are located close to Main Lode. These have similar geological
    characteristics as the Main Lode. Potential for all Lodes to link up underground to form a major
    deposit of high quality Copper with bonus, Lead, Zinc, Silver and Gold recovery. It is estimated
    that the Lead, Zinc, Silver and Gold could cover copper production costs.

    CURRENT PROJECT STATUS
    Owners are currently seeking investment in the project to fund project development.
    Presentations have commenced to potential investors to raise at least $15 million to conduct
    further drilling to increase estimated reserves from 40,000 tonnes of Copper metal to 300,000
    tonnes and to begin production of high grade copper within 12 months or as soon as mining
    permits can be obtained. Production target is 30,000 tons of copper plus gold, silver, lead and
    zinc per year

    PROPOSED FUTURE ACTIVITIES
    Phase 1: To test secondary zone within the Main Lode, Eastern and Southern Lodes - 10 drill
    holes totaling 765m
    Phase 2: To test the primary zone within the Main Lode - 8 drill holes totaling 1052m
    Phase 3: Major drill program (on all four lodes) to expand resource to 300,000 t of contained Cu
    metal.
    At the same time rehabilitating the 200 foot “Main Shaft” to access and mine ore at 15% Cu.
    Mining could commence within 12 months subject to permits


    Project: Prospect D
    COMMODITY: Nickel Copper Gold
    PROJECT DETAILS
    Project Name: Prospect “D”,
    Location: Barrow Creek, NT,
    Project Tenements: 50% of EL 23186

    HISTORY OF PROJECT AREA
    During the nickel boom in 1972/3, Kewanee Oil conducted extensive drilling establishing drill
    indicated reserves of over 3 million tons of nickel/copper ore over a length of 2km, a width of
    9metres .
    Established drill indicated reserve of 3Mt being 1.63Mt oxide and 1.53Mt of sulphide.
    Tons Cu Ni Width
    Oxide - 1,633,600 0.512% 0.151% 9.14m
    Sulphide 1,530,200 0.621% 0.24% 8.53m
    (Source: Kewanee Oil Australia Ltd)

    1. DDH1BC with 0.91m @ 4.65% Ni and 1.4% Cu. Delineated strike length 2km.
    2. DDH1BC with 2.4m @1.95% Ni and 1.23% Cu from 143.7 meters and 7.3m @ 0.3% Ni
    and 1.01% Cu from 181.66m.
    3. DDH5BC with 7.6m @ 0.93%Ni and 1.46% Cu from 85.3m and 17.4m @ 0.98% Cu
    from 88.74m.
    4. DDH7BC with 5.2m @ 0.48% Ni and 1.48% Cu from 81.08m and 7m @4.2g/t Au.
    (DDH7BC was the only drill hole previously assayed for gold. Owing to current gold
    price this may represent a significant uplift in the project value eg: 4.2g/t = 33lbs or
    1.5% Cu, which until now has not been included.)

    The owners obtained the Exploration license in 1999. Since then substantial drilling and
    geophysical surveys have been completed with the services of BHP Minerals Pty Limited and
    Mithril Resources Ltd.

    In 2004, BHP/Mithrill conducted a $1M drill and geophysics program after exercising an option
    to Joint Venture with the owners of EL 23186. Following BHP taking over Western Mining Corp
    in June 2005, BHP did not proceed to a proposed JV development with the owners of Prospect
    D. In their reports on their drill program BHP/Mithril described the mineralisation as having the
    potential to host sulphide mineralisation of a style similar to the massive Voisey’s Bay Nickel
    deposit in Canada.
 
watchlist Created with Sketch. Add KDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.