Dominion Mining Ltd (ASX code: DOM) today announced a new zone of
high-grade mineralisation intersected during the current underground
resource/reserve upgrade drilling and development program at the
Challenger project in the Gawler Craton, South Australia.
A folded structure similar to the M1 Shoot, but smaller, has
been intersected on a number of levels over a vertical distance of 60
metres. This new structure, about 15 metres above the M1 Shoot, is open
both up and down plunge.
Intersections include 6.0m at 54.74g/t, 11.25m at 97.93g/t, 3.0m
at 53.39g/t and 3.15m at 152.59g/t gold.
Dominion Mining Ltd (ASX code: DOM) today announced a new zone...
Add to My Watchlist
What is My Watchlist?