getting well ahead of myself, but thinking of a hypothetical company with similar characteristics to pluton.
just some back of envelope calcs...
assume $80 profit per tonne of ore.
assume load capacity of 180 000tonnes per ship.
assume 20 million tonnes resource.
a ship leaving the berth every month with $15 mill on board for nearly 10 years.
profit and tonnage conservative figures.
for memory tony mentioned cost per tonne and the number was well south of 20 bucks a tonne.
- Forums
- ASX - By Stock
- ho hum
getting well ahead of myself, but thinking of a hypothetical...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)