Interesting, because the HBI plant has been deleted and the pellet plant could now be built in China.
That together with a hoped for increase to 24 million tonnes per annum means that the current costing is obsolete.
- Forums
- ASX - By Stock
- hold on rimtalay
Interesting, because the HBI plant has been deleted and the...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)