Magadan,
this would be true if the additional tonnage was to go to the curent bidder which would require them to look at there BFS again.
This may not be the case if another goup wished to develope the additonal 12MTPA which would either mean another new plant adjacent to the Shogang plant or maybe an upgraded shogang plant.
If the latter was the case then the cost would be taken up by the new group, with the posibility of a reduced cost to ARH-Shogang(JV)and obviosly to the ARH Additional 12MTPA partner.
- Forums
- ASX - By Stock
- ARH
- hold on rimtalay
hold on rimtalay , page-11
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARH (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online