RED 12.3% 32.0¢ red 5 limited

Honesty, Ethics & Respect

  1. 1,327 Posts.
    lightbulb Created with Sketch. 9
    A bit of review GJ;  the 2013 SPP dated 17/9/2013;
    Section 1.1 the risks section (d) general operating risks associated with recommencement of production etc, etc...mine infrastructure & maintenance; let me re-iterate maintenance.

    Budget for pit de-watering (maintenance) $2.4M (see pg 11); let me re-iterate pit de-watering budget $2.4M (maintenance); see also ASX image 8/10/2014 pg 3 in regards to the affects of the pit de-watering /maintenance program; there are also satellite images dated Jan 2015 posted on HC showing the affects of the open pit de-watering / maintenance program.  See also images Northern ramp & Eastern wall failures per ref Dr S 23/7/2015.

    Tailings dam 10 budget (see pg 11) $4M; this is the new tailings dam which is supposed to be built in 2 years; quote "The company has identified a site for the new tailings dam and has commenced the process of land acquisition and permitting" (see pg 15).

    Current cash position is $12M; based on image references above & progress on the new TSF10 dam one could assume the current cash position is bolstered to some extent IMO.
 
watchlist Created with Sketch. Add RED (ASX) to my watchlist
(20min delay)
Last
32.0¢
Change
-0.045(12.3%)
Mkt cap ! $2.176B
Open High Low Value Volume
34.0¢ 34.5¢ 31.5¢ $21.62M 65.95M

Buyers (Bids)

No. Vol. Price($)
1 3000 32.0¢
 

Sellers (Offers)

Price($) Vol. No.
32.5¢ 674965 9
View Market Depth
Last trade - 16.10pm 29/08/2024 (20 minute delay) ?
RED (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.