-
Share
08/02/12
16:00
Share
from the 12/01/09 ann "maiden jorc resource carajas copper project"
antas sth hgz total resource 210,000t @ 11.65% cu for 24,500t cu
from the 08/02/12 ann "major resource upgrade for rio verde"
antas sth hgz total resource 380,000t @ 5.93% cu for 23,000t cu
and note the 9m @ 50.49% Cu was from the 2010 hgz drilling program, ie incl only in the resource reported today
and the hgz is reported to have more than doubled in strike length since the antas sth maiden resource
interestingly avb have now included au in the antas sth resource
cheers
-