CMD 0.00% 0.6¢ cassius mining limited

Hopefully not to long., page-9

  1. 102 Posts.
    lightbulb Created with Sketch. 3
    Drilling commenced the 11th of may. The dual rig drilling programme is expected to take approximately 30-45 days. The results of the assays from the drilling programme should be available in 35 days
    after the completion of the drilling programme.
 
watchlist Created with Sketch. Add CMD (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.